The rapid increase in transport on the roads of Russia, entails the emergence of a number of problems that relate to the norms of the safe movement of cars and pedestrians. For many years now, the authorities have been trying to improve these norms by implementing various programs, adopting new traffic rules to make both sides safer on the road. However, in this situation, it is impossible to ignore the factor of the city's infrastructure development. Every day the amount shopping centers, high-rise office buildings, sports grounds and stores are increasing. None of the facilities can function without an access road, and due to the growing population in cities and the general complication of the situation on the roads, the development of a traffic management project (TRA) is very important. The authorities monitor compliance with safety standards, and therefore drafting and approving a project takes a long time.

If you need to draw up a high-quality PID in the shortest possible time, our company "PPR EXPERT" LLC offers a full range of professional services for the development and approval of a project of any scale and complexity.

Organization of efficient and safe movement of cars and pedestrians - priority activities of LLC "PPR EXPERT". Our key goal is to ensure safety on the road through the correct organization of the movement of pedestrians and vehicles in the territory that belongs to the customer company.

We also develop such traffic management projects for enterprises that are engaged in or carry out construction and repair work. For example, if a company started repairs, then the delivery of materials, special equipment and garbage collection should not create emergency situations and impede the movement of workers. Therefore, if you need such a project, our specialists are ready to draw up it as soon as possible.

Why is PAD important?

POD is part of the documentation of any structure. Without it, a commercial, residential or communal facility cannot be approved and put into operation. Also, the AML can request the traffic police department to verify compliance with the norms and standards of the ODD.

Who is involved in the development of PADM in our company?

The preparation of a traffic management project is carried out by specialists of our company, who not only have the appropriate qualifications and experience, but also know all the subtleties and features of certain situations.

During the development of the PID, our specialists take into account the traffic situation around the customer's building, the peculiarities of the road junction, additional buildings to which you need to make an entrance (parking, underground parking, pedestrian zone).

Knowing and taking into account all the subtleties of drawing up a new transport interchange, our specialists are ready to develop such a project that will be accepted by the authorities and implemented in practice. We do not make unsuccessful projects, as evidenced by the grateful feedback from our customers.

What is a ready-made traffic management project from PPR EXPERT LLC?

The finished traffic management project consists of several parts, namely:

  • Title part indicating the official data of the company;
  • Project composition or content;
  • Explanatory note, which indicates the address of the location of the new transport interchange;
  • Main part;
  • Scheme of the main object, adjacent areas and additional zones;
  • Site survey results with expert opinion on the possibility of building a new road;
  • Schemes with the location of road signs and their specification;
  • Schemes of the organization of transport and pedestrian traffic on the territory of the customer's facility;
  • Diagrams of transport hubs, parking and underground parking;
  • Visual sketches of the information board;
  • The conclusion about the volumes of the robot;
  • List of required regulatory documents.

With whom do you need to coordinate the PAD?

About cooperation state structures a lot is known with the population. To approve a traffic management project, each owner of the facility must contact the following authorities, which must check and approve the project, namely:

  • Department of Transport;
  • Federal Security Service;
  • Bodies of the traffic police;
  • SUE AMPP;
  • GUP MOSGORTRANS (if necessary).

The approval of the project in each of the above instances takes 2 weeks or more. As a result, the commercial facility is idle due to unapproved documents. We are ready to accelerate your expectations and coordinate all documents with these structures as soon as possible.

What do you get by contacting "PPR EXPERT" LLC?

By contacting our company, you will receive an AML compiled in accordance with the norms and standards, which is approved in state authorities and is ready for implementation. We guarantee a quick solution to all assigned tasks that relate to the design and organization of traffic. Our professionals never deviate from the deadlines, and therefore you can rest assured of the reliability of our company. The cost of our company's services can be viewed on the website or by calling.

The procedure for the development and approval of a road traffic management project

The procedure for the development of a road traffic management project (TRMP), as well as its composition, given below, applies to the highways of the Russian Federation intended for public use.

Basis for the development of PAD

  1. The development of a traffic management project is carried out on the basis of clause 2 of Art. 21 of the Federal Law No. 196-FZ "On Road Safety" dated December 10, 1995 No.
  2. This procedure determines the list of indicators that must be contained in the PAD in relation to public roads.
  3. When developing a project for the organization of a road, it is necessary to be guided by the following regulatory documentation: the legislation of the Russian Federation, regulatory legal acts of federal and regional authorities, rules and standards, technical standards.
  4. Depending on the classification of roads, the customers for the development of PAD are:

    4.2. for federal roads - Federal Road Agency (FDA) Rosavtodor;

    4.3. for roads of constituent entities of the Russian Federation - executive authorities of the respective constituent entity;

    4.4. for municipal roads - the executive authorities of the municipal formation;

    4.5. for departmental and private roads - the owners of these roads.

Purpose and objectives of the traffic management project

The two main goals for the development of PTS are:

  1. raising bandwidth the road (or its section), by optimizing the methods of organizing traffic;
  2. ensuring the safety of the vehicle and pedestrians.

The range of tasks that the traffic management project solves is determined by the design assignment, as well as the results of the analysis of the traffic situation on this road (or its section). Technical task for development is drawn up and approved by the customer.

The main tasks to be solved by the AMP are:

  • ensuring the safety of all road users, both pedestrians and vehicle;
  • introduction of traffic regimes based on the category of the road, characteristics of nearby structures, structural elements and other factors;
  • creation of conditions for optimal and correct use by drivers of the width of the road (carriageway);
  • ensuring that all traffic participants are informed about road conditions, the location of settlements and transit routes through them;
  • other tasks specific to the project.

Requirements for registration

According to the established standards, the traffic management project must be issued in the form of a book bound in A3 format (297 × 420 mm.); An electronic copy on a CD is also required. Documents in electronic form must provide for the possibility of editing.

The road traffic management project should include:

  1. title page including:

    1.1. the name of the body (organization) that performs the functions of managing this road;

    1.2. the name of the organization (company) developing the AML;

    1.3. a list of organizations that agree and approve the project;

    1.4. full name and designation of the road;

    1.5. volume number;

    1.6. details of the head of the developer organization, namely position, full name and signature;

    1.7. date of project development;

  2. introduction;
  3. layout plans for the placement of technical means for traffic management;
  4. when using signs of individual design, it is necessary to provide their sketches;
  5. layouts of traffic light equipment;
  6. a statement of the placement of traffic control means;
  7. list of the organization of electric lighting, bus stops, sidewalks and pedestrian crossings (by level).

Schemes, scale, composition of address lists in PAD

For traffic management projects, the recommended linear scale is 1: 3000, and for the width of the road, an arbitrary scale is allowed.

The structure of the layout of technical means for the organization of road traffic should include:

  • the contours of the road plan (limited by the edges);
  • longitudinal slope schedule;
  • plan curves;
  • road marking lines;
  • road signs;
  • road barriers;
  • pedestrian fences;
  • guiding devices;
  • road traffic lights;
  • pedestrian crossings at different levels;
  • lighting elements;
  • bus stops;
  • walking paths;
  • railway crossings;
  • artificial constructions;
  • projected as well as existing buildings and structures for road and motor transport purposes;

For complex intersections at one level, as well as for intersections at different levels, it is necessary to make a more detailed diagram on a smaller scale, the scale is determined according to the scaling rules, while the locations (addresses) of the installation of technical means for organizing traffic are indicated.

The road traffic management project should contain the following address lists (each should contain a summary):

  1. a consolidated statement of volumes of horizontal road markings, which should contain:

    1.1. nomenclature of markings with a per-kilometer breakdown;

    1.2. types of road markings;

    1.3. reduction of the marking volumes to line 1.1, indicating the marking area (by kilometers) in m2, while also indicating the reduction coefficient for each type of marking, for its different types, the area in m2 is indicated.

    1.4. indicating the area of \u200b\u200broad markings in m2 for this section of the road (at the end of the table in linear kilometers);

  2. a list of the location of road signs, which contains:

    2.1. number of characters;

    2.2. their names;

    2.3. number of signs;

    2.4. standard size;

    2.5. area of \u200b\u200bsigns (only for custom design signs);

  3. list of placement of barrier fences;
  4. a statement of the placement of signal columns;
  5. a list of placement of artificial lighting;
  6. a list of bus stops location containing:

    6.1. location address (km + m);

    6.2. location data (right, left);

    6.3. data on the availability of landing sites;

    6.4. location of entry pockets;

    6.5. pavilions;

    6.6. transitional speed lanes;

  7. a list of the location of pedestrian crossings;
  8. a statement of the presence of traffic light objects and a scheme for placing equipment on them;
  9. a list of the placement of footpaths;
  10. list of placement of pedestrian barriers.

Coordination of the road traffic management project

According to the current regulations, AML projects are subject to mandatory approval by the departments of the State Traffic Inspectorate of the Ministry of Internal Affairs of the Russian Federation, which are in charge of the projected road. The responsibility for agreement is assumed by the design organization.

Depending on the type of the projected facility, the traffic management project is agreed in the following instances:

  • for federal highways, the approval of the AML is carried out by the Department of Traffic Support of the Ministry of Internal Affairs of the Russian Federation;
  • for other federal highways, as well as public roads of I, II, III and IV categories of regional or inter-municipal significance of the constituent entities of the Russian Federation, high-speed highways and main streets of city significance, coordination is made by the road inspection service of departments (departments, departments) of the traffic police of the Ministry of Internal Affairs, the Central Internal Affairs Directorate , ATC of subjects of the Russian Federation;
  • for highways below the V category of the constituent entities of the Russian Federation, departmental and private highways of municipal importance - by the road inspection service of departments (offices) of the State Traffic Safety Inspectorate, ATC, EFA of cities and regions;

Procedure for approval and amendments

The traffic management project is approved by the customer. Also, the customer's responsibilities include making timely changes to the POD, in the event of the introduction of new regulatory documents.

Any changes to the road traffic management project are subject to mandatory approval by the appropriate traffic police department. The changes themselves are made and re-approved at least once every 3 years. Previous versions of PAD are kept by the customer, as well as in the traffic police department.

Changes to the AML, as a result of overhaul or reconstruction, are made on the basis of the approved project, the responsibility for making changes and their approval in the traffic police lies with the customer.

If individual signs are used in the traffic management project, then their design must be carried out in accordance with regulatory requirements... Sketches of individual signs should be designed as follows:

  • one sign is designed on one sheet according to the scaling rules;
  • the numbers of the sign and background are also indicated there;
  • sign area;
  • number of signs;
  • their location;

Where to send the approved POD

After the approval or introduction of changes to the traffic management project, the developer is obliged to send the project documentation to the following authorities:

  1. direct customer - 1 copy (book A3) + documentation in electronic form on CD media (with files that can be edited);
  2. to the road control body - 1 copy (book A3) + electronic documentation on a CD (with files with the ability to edit);
  3. for main federal roads to the Department of Traffic Safety of the Ministry of Internal Affairs of the Russian Federation - 1 copy (book A3) + electronic documentation on a CD (with files that can be edited);
  4. to the corresponding control body of the traffic police, the police department and the ATC - 1 copy (book A3) + electronic documentation on a CD (with files that can be edited);
  5. to the road maintenance organization - 1 copy (book A3);

An example of a traffic management project (TRA):

The company PPR Expert has developed a project for the organization of traffic to the object: "Residential complex with engineering infrastructure", located at the address: Moscow region, Odintsovsky district, Barvikhinsky village, near the village of Razdory.

Any road requires many safety guarantees, which can only be provided by well-designed traffic management projects. The complex of such measures is called ODD, and for their effectiveness it is necessary to optimize the directions for pedestrians and motor transport as much as possible.

Road design

Projects must be necessarily coordinated, and therefore they are drawn up by professionals. Many companies provide similar services, including the development of a package of documents for all types of actions, after which the movement of transport and pedestrians of this section of the path changes. Developers and make its approval in instances.

Traffic management projects are necessary if it is planned to restore an old road or build a new one, as well as when repairing engineering structures and the roads themselves, when a special and safe movement of removing garbage and construction Materials special vehicles.

Conditions

It is necessary to draw up such a project and in cases where it is planned or the arrangement of a parking lot. Traffic management projects are necessarily developed for especially dangerous sections of the road in order to reduce the accident rate. If the construction of gas station or car service enterprises begins directly along the road, such documentation must be agreed upon before starting work.

Coordination is carried out in the following departments: State traffic inspectorate of the Ministry of Internal Affairs; the organization on the balance sheet of which this road is contained; Department of Transport; FSO; TsODD and many others. This is certainly troublesome, but necessary: \u200b\u200broad accidents are much more expensive. In Moscow and the region, projects are coordinated by Mosgortrans, Mosavtodor and others.

Norms of movement

The goals of developing road traffic management projects are as follows: streamlining traffic regulations, safety on access roads to industrial zones, shopping centers, neighborhoods and other places. Such work should be entrusted only to experienced professionals who will responsibly treat this most important task and know all the nuances and subtleties of creating road schemes. Otherwise, the approval of the traffic management project may not take place.

The POD contains all the schematically depicted objects: the outline of the road, markings, indication of sidewalks, pedestrian crossings, the location of traffic lights, fences and road signs, the organization of lighting, transport stops, artificial structures and railway crossings. All this must be correctly formalized in the project documentation.

Professionals

Each element has its own symbol, as stipulated by the traffic management project. An example of such a project can be seen in the photo in this article. It was developed in a professional company that has been dealing with similar projects for ten years. In the drawing, even an ignorant person can see how safety on the road is organized, how to properly plan traffic in a given territory.

However, the terrain is all different, and therefore, the development should still be masters of their craft, confident in the entire extensive design complex. First of all, you need to focus on state standards, and specifically - GOST R 52289, where the means for the organization and implementation of traffic rules for the use of markings, road signs, fences, traffic lights, guiding devices are fully described.

GOSTs

There is a procedure for the development of projects of an organization that requires the implementation of a much larger number of rules than any other documentation. A separate GOST describes the procedure for using road signs - GOST R 52290. The types and parameters of the traffic lights used must be confirmed by GOST R 52282. There is also Federal Law No. 196 of 1995, which is entirely concerned with road safety and is always applied in the practice of developing and approving POD. They develop ODD projects during the expiration of the expiration date of already existing horizontal marking schemes and the deployment of existing road signs.

In order to prevent accidents on the roads, it is necessary to be guided in the development of an AML, first of all, by the legislation of the Russian Federation and regulations of the executive power, as well as by many rules, technical norms and standards. An analysis of the current traffic situation on this site is mandatory. The organization of road safety is always guaranteed by a project, which is developed on the basis of Federal Law No. 196 (Article 21, paragraph 2). The customers of the projects are those authorized in the management of: federal roads - the Federal Road Agency; roads in the constituent entities of the Russian Federation and municipalities - executive branch; departmental and private roads - owners.

Tasks

Road safety during the movement of pedestrians and vehicles - the main objective development of PID. It is also important to increase the bandwidth. After a detailed analysis of the existing situation, the design of the organization of traffic is carried out, taking into account the problems and solving problems to eliminate them. The customer draws up and approves the technical task himself, after which the developers are taken over.

POD must necessarily comply with all the requirements of GOST and solve the corresponding problems. First of all, ensure the safety of all road users; according to the category of the road, introduce all the necessary modes of movement, in accordance with all factors: structural elements of the road, artificial structures and the like. Particular attention should be paid to timely informing traffic participants about certain road conditions located along the way of settlements, travel routes (for example, the transit of large cars through the territories of cities is not allowed, you need to indicate bypass routes). It is necessary to ensure the correct use of the carriageway by drivers, indicating the narrowing of the road and its other features.

How it looks

POD is a whole book bound in A3 format (197 x 420) and electronic view document (in editable format) on CD-ROM. As in this book, POD opens a title page followed by an introduction. Further there are diagrams with the arrangement of technical means and traffic light objects; sketches of signs for individual design; the statement in which the ODD funds are placed; a list showing the electric lighting device, bus stops, sidewalks, paths, crossings (different levels). On title page the name of the governing body of this road must be indicated; the name of the organization that designed the ODD; the names of the organizations that agreed and approved the project.

Below is the name of the road and its designation, volume number, position of the head of development with the surname and signature. Below, as always, is the date of development of the POD. The linear scale is usually taken as 1: 3000, and the width of the road is depicted arbitrarily. The layout scheme should contain the contours of the road plan, graphs of longitudinal slopes and curves in the plan, road signs, marking lines, road and pedestrian fences, traffic lights, guiding devices, pedestrian crossings, lighting, stops, paths for pedestrians, artificial structures, railway crossings, existing and projected buildings and structures for motor transport and road use (coordination axes are not needed).

Vedomosti 1

Multilevel intersection schemes and single-level complex intersections are performed separately (smaller scale), according to the scaling rules. The addresses where the technical means of ODD are installed are indicated. Most of the project is made up of address lists.

Including a summary sheet on the volume of horizontal markings with the nomenclature of road horizontal markings. Half-kilometer breakdown, types of marking, bringing its volumes to the 1: 1 line, where the coefficient of reduction is indicated - for different types. For each type of marking, the volume is shown in square meters... The marking area is indicated in the last column for each kilometer, the volumes for this road section at the end of the table in kilometers - reduced and linear, as well as the area in square meters.

Vedomosti 2

The list with the placement of road signs indicates the numbers and their names, the number and size of the type. If there are signs of individual design, you need to indicate their area.

The third statement concerns the barrier fence, the fourth - the fifth is devoted to artificial lighting.

Placement list must contain address, location - left or right, landing sites, check-in pockets, pavilions, transitional speed lanes. They also draw up statements on the placement of pedestrian crossings, the presence of traffic lights with diagrams of their equipment, and the placement of footpaths. All statements should be summarized.

Agreement

PIT is subject to mandatory approval by the departments of the State Traffic Inspectorate of the Ministry of Internal Affairs. The design organization is engaged in this. can be considered depending on the object, as mentioned above, either by the RF Traffic Department (main roads, federal highways, public highways from the first to the fourth category inclusive, high-speed highways and streets of continuous traffic of city-wide significance, and so on), or services of departments, divisions, directorates of the Central Internal Affairs Directorate, the traffic police, the Internal Affairs Directorate of the subjects of the Russian Federation. Roads below the fifth category, as well as departmental or private, belong to the traffic police services of regions and cities, where they are coordinated.

The customer approves the AML. After receiving the finished project, he must in time make all the changes that may be associated with the new standards of documents that are being put into effect. All changes in the AML must also be agreed with the traffic police department at least once every three years. All previous versions of the AML are kept by the customer and the traffic police, as it is supposed to store the documentation for the regulations. Changes related to reconstruction or overhaul to improve road safety must be made and agreed by the customer.

Copies

Already approved projects and all subsequent changes must be sent to the following authorities.

  1. Customer department (or department) - one copy plus CD-ROM (editable document).
  2. The road governing body is one copy plus CD-ROM (editable document).
  3. To the Department of Traffic Safety of the Ministry of Internal Affairs (main roads), in the same way, one copy of the documentation and a CD-ROM (a document with the possibility of editing).
  4. The governing body of the traffic police (ATC, GUVD, MVD) - the same one copy in paper and one in electronic version.
  5. Road operating agency - one copy of the paper version of the documentation only.

Development of PADIs the process of designing measures to increase traffic capacity and ensure the safety of vehicles and pedestrians.

JSCB Monolit has been developing POD for over 10 years.

When developing a PID, our specialists solve the problems of ensuring road safety, protecting the life and health of citizens, property, as well as protecting the environment.

You can order a traffic management project:
for the period of work;
for the construction period;
for the period of operation.

The development of PAD consists of 4 main parts:
traffic organization scheme;
technical means of traffic management;
statement of means of organizing traffic;
explanatory note.

Traffic organization diagram

To ensure the safety of road traffic during construction, our specialists as part of the POD are developing traffic organization schemes.

The traffic organization scheme is developed for:
prevention of road accidents associated with changes in traffic conditions and pedestrians;
ensuring sufficient carrying capacity of road sections on which construction is underway;
ensuring the safety of builders.

The place of work is the section of the road on which construction, reconstruction or repairs are carried out, as well as other work that necessitates a temporary change in the movement of traffic and pedestrian flows.

Depending on the terms of construction, the POD distinguishes between the places of production of long-term and short-term works.

When developing a PID, our specialists plan the production of work in such a way that:
their duration and length impeded the movement of cars and pedestrians as little as possible;
provided a throughput sufficient to pass traffic flows in the working area;
provided safe conditions for the movement of vehicles and pedestrians;
provided safe working conditions for people carrying out construction.

Before the start of construction, our specialists determine the procedure for the passage of vehicles and pedestrians, as well as their modes of movement in the places of work, ensuring the safety of both road users and builders.

The organization of traffic on the work sites is chosen by our specialists depending on:
duration of construction;
road categories;
complexity of road conditions;
locations and lengths working area;
the actual traffic intensity of the traffic flow;
the width of the carriageway closed to traffic.

The place of work is equipped with the help of technical means of organizing road traffic, fencing devices and signaling devices.

The types of technical means and fencing devices are selected by our specialists in accordance with:
with the category of the road;
duration and type of work;
the danger of the place of work.

During the construction, reconstruction and repair of objects capital construction, regardless of the form of their ownership, for the arrangement of work places our specialists use:
temporary road signs;
temporary road markings;
guarding and guiding devices;
signaling means;
travel devices.

The section of temporary traffic change consists of five functional zones, in each of which certain tasks are solved to organize and ensure traffic safety:
warning zone;
distillation zone;
longitudinal buffer zone;
work zone;
return zone.

Warning zone

The beginning of the warning zone is determined by the location of the main road works sign, and its length is determined by the distance to the first guiding or guarding device.

Drive away zone

In front of the working area, in cases of narrowing of the carriageway, a smooth change in the trajectory of the movement of vehicles is provided along the length of the separation zone. The minimum length of the back-off zone is taken depending on the width of the carriageway closed for the movement of vehicles in the working area.

Longitudinal buffer zone

The length of the longitudinal buffer zone is different for short-term or long-term construction works... If the longitudinal buffer zone falls into an area with limited visibility, it is extended to the beginning of that segment. In mobile road works, the length of the longitudinal buffer zone is taken to be equal to the distance from the cover vehicle to the vehicle performing the work. It is prohibited to place construction materials and construction equipment in the longitudinal buffer zone.

Work zone

The length of the working area is determined taking into account the work technology and economic feasibility.

Return zone

The length of the return zone is taken equal to the distance from the end of the working zone to the installation site of the last guide device. The length of the runaway in the return zone also depends on what kind of work is being done short-term or long-term.

Technical means of organizing traffic

To regulate traffic flows and ensure safety, technical means of organizing traffic are used.

When developing PAD, our specialists use the following traffic control tools:
enclosing devices;
guiding devices;
protective cords and tapes;
signaling and lighting equipment;
engineering and technical means;
supports for signs;
temporary road signs;
temporary road markings.

Fencing devices

Parapet blocks made of polymeric materials... They are used in PID for fencing the area of \u200b\u200bwork with a duration of more than one day, dividing and diverting traffic flows by highways and the streets. When installed, blocks of white and red alternate. To ensure stability, the fencing sections are filled with water (in summer), brine (in winter) or sand.

Parapet blocks made of reinforced concrete. They are used to fence off the work area with a duration of more than three days and to separate traffic flows in opposite directions on highways and streets. Blocks are installed and fastened together without gaps along the roadway. When installed, blocks of white and red alternate. Blocks in combination with a pedestrian flooring are arranged to organize temporary movement of pedestrians when sidewalks are closed in places of work for more than three days. Blocks are installed on the roadway at a distance of at least 1.5 m from the side stone. To prevent pedestrians or animals from entering the road through the blocks, a net or other protective elements is additionally installed on them.

Travel buffer. It is used in POD to prevent a car from colliding with the end part of a parapet-type concrete block. The inner cavity of the road buffer is filled with water (in summer), brine (in winter) or sand.

The shield is solid. It is used for fencing areas of excavation work on roads and streets with a duration of work less than one day.

Lattice shield. It is installed in the POD on highways and streets outside the carriageway for fencing of work areas designated for temporary storage of materials and equipment, with a duration of work less than one day.

Grid. It is used to close existing and fencing temporary pedestrian paths in places of work on highways and streets within settlements, at pedestrian crossings and stops public transport.

Perilo-rack barriers. They are used in PODs for fencing work sites, including areas with openings no more than 10 cm deep on highways and streets. Barriers are installed across the carriageway, closed to traffic, at the end of the traffic flow diversion zone. On roads outside settlements, to ensure visibility, barriers are equipped with reflective elements at night.

Picket barriers. They are used for fencing the site of the production of works of a mobile nature during daylight hours. Barriers are installed across the roadway or shoulder at least 10 m before the work area.

Guiding devices

Cones. They are used in POD to deviate the traffic flow during the work, as well as to designate the boundaries of the carriageway section, along which the movement of vehicles is temporarily restricted.

Plates are rectangular. They are used to designate trajectories when the traffic flow deviates on roads and main streets with six or more lanes. Plates are installed throughout the distillation zone.

Rod and flag milestones. They are used in the POD to mark the boundaries of the work area on the roadsides and the dividing strip on highways and streets in combination with other fencing devices.

Safety cords and tapes

Cords with flags. They are used in POD to designate the boundaries of the work area on highways and streets. Flag cords are placed parallel to the installation line of the guardrails. Cords with flags are used in combination with other fencing devices installed in the work area with gaps no more than 10 cm deep. Cords with flags are located at a distance of 1.2-1.5 m from the surface of the roadway.

Protective tapes. They are used to mark the boundaries of temporary pedestrian paths during daylight hours on highways and streets. The belts are used in combination with other fencing devices installed in the work area with openings no more than 10 cm deep. The belts should be located at a distance of 1.2-1.5 m from the road surface.

Signaling and lighting equipment

Traffic lights. They are used in POD to regulate traffic in places of narrowing of the carriageway, when alternating traffic in one lane is organized. Self-powered traffic lights are used in places where there are no permanent power supplies.
The use of temporary road traffic lights is carried out if necessary:
- organizing the shuttle movement of vehicles, when the free width of the carriageway allows for movement only in one row at high intensity;
- cessation of traffic flow along the section of the road for short, often repeated periods of time necessary for maneuvering construction vehicles and the passage of specialized rolling stock when performing long-term repair and construction works;
- organization of round-the-clock regulation of traffic at intersections during the production of work, if these periods create conditions under which it is necessary to introduce traffic light regulation.
The calculation of traffic light control cycles is based on the condition of minimizing transport delays.
Traffic lights are installed in front of the narrowing of the road, where it is possible for the accumulation of vehicles waiting for the appearance of a permitting traffic light, without interfering with traffic in the opposite direction.
Installation of traffic lights and manual control is possible.

Hanging lights. They are used to mark the boundaries of the zone for the production of work lasting more than one day in the dark, and in the light - with meteorological visibility less than 200 m on highways and streets. Lanterns are placed on fencing devices and barriers. When placing lanterns along the border of the work area, the distance between them is taken as 3-5 m.When placing lanterns on technical equipment installed across the roadway temporarily closed for traffic, at least two lanterns are installed per lane with a constant red signal.

Plug-in lights. They are used in POD on highways to mark the boundaries of the work site at night, and in the daytime - when the meteorological visibility is less than 200 m. Plug-in lights are installed on fencing devices similar to the installation of pendant lights.

Portable lighting device. They are used to illuminate construction sites at night.

Engineering and technical means

The bridge is pedestrian. It is used in POD in places where sidewalks and footpaths are broken when it is impossible to organize the movement of pedestrians along a temporary path bypassing the place of breaking.

Barrier. They are used for temporary closure of traffic, as well as for regulating the entry and exit of industrial vehicles. The barrier is installed at the beginning and at the end of the section temporarily closed for traffic.

Supports for signs

Portable column-type supports. Installed in the POD on the carriageway, roadside or dividing strip. the design of portable post supports must ensure the stability of the signs under the influence of wind load.

Portable complex. It is used with temporary road signs and is installed on the side of the road at a distance of 50 m from the beginning of the traffic flow diversion zone.

Mobile complex for road signs. It is used in PID on roads and streets to place temporary road signs in places of work, including those of a mobile nature. The complex presents a light board with a flashing arrow indicating the direction of lane change to an empty lane. In the upper part of the display, there are two yellow warning lights operating in a flashing mode. The complex must be located on the carriageway at the end of the traffic flow zone at a distance of at least 15 m from the work area.

Temporary road signs

Installation of temporary road signs in the POD is carried out in accordance with the requirements of GOST R 52289-2004. The dimensions of temporary road signs must be at least those that must be used for this category of road or street in accordance with the current standard.

When carrying out work on highways, as well as on dangerous sections of other roads, signs of an increased standard size should be used. It is allowed to place images of signs on boards, the surface of which has a fluorescent yellow color.

If the duration of road works is more than a day, road signs are used in the POD, the images (details) on which are duplicated by LEDs operating in a flashing mode.

Traffic signs previously installed on an operated road or street at the work sites are dismantled or hung if their information contradicts the information of temporary traffic signs.

The dimensions of the portable supports are selected in POD, taking into account the correspondence of the dimensions of the road signs used. The support elements should not protrude beyond the lateral edges of the sign by more than 0.2 m. In this case, the plane of the road signs should make an angle of 90 ° with the surface of the pavement, and 90-100 °, installed on the folding supports. It is allowed to install temporary road signs on the roadway, shoulders, fences or barriers used in the places of road works. In this case, the lower edge of the sign must be at least 0.6 m above the ground or road surface.

Road signs located to the right in the direction of travel are duplicated on the left side of the road, on the median strip or on the carriageway, if the traffic conditions are such that the sign may not be noticed by the driver.

Temporary road signs or groups of signs are located at a distance of at least 50 m from each other on roads outside populated areas and 25 m on roads in populated areas.

Sign 1.8 "Traffic light regulation" is installed in the POD in the case when traffic on the section being repaired is regulated by a traffic light.

Sign 1.15 "Slippery road" is used in PID when increased slipperiness of the carriageway is possible in comparison with the previous section, caused by the work carried out, the removal of clay and mud from the adjacent roads, along which a bypass route is arranged or the formation of ice. Sign

1.16 "Rough road" is installed in the POD if there are defects on the road surface in the area of \u200b\u200broad works (potholes, ledges from the laid or removed layer of the cover, etc.).

Sign 1.18 "Ejection of gravel" is installed in the POD when arranging or repairing gravel and crushed stone surfaces, during surface treatment of the surface and in cases where it is possible to eject gravel, crushed stone from under the wheels of a car. The sign is installed at the time of work and is left until the coating is completely formed.

Signs 1.20.1-1.20.3 "Narrowing of the road" are installed in the POD to warn drivers about the narrowing of the carriageway or road bed, regardless of the reasons that caused this narrowing.

Sign 1.21 "Two-way traffic" is installed in the POD to warn drivers about the area where, due to road works, two-way traffic is temporarily organized. The sign is installed in front of a section with two-way traffic if one-way traffic was carried out before it on the carriageway.

Sign 1.25 "Road works" with a sign 8.1.1 "Distance to the object" is installed in the POD first in the direction of travel. In addition, it is repeated at least 50 m before the start of the traffic flow separation zone with plate 8.2.1 "Coverage area". In settlements and in confined conditions, a repeated sign 1.25 with plate 8.2.1 is installed directly at the beginning of the work area.

When carrying out short-term work related to preventive inspection of underground utility wells or cleaning the roadway, one sign 1.25 is installed on a portable support and a barrier of 1.6 or 1.7 at a distance that provides early warning of drivers about the danger, but not less than 15 m.

Sign 1.33 "Other hazards" is used in the POD to warn drivers about the presence of a hazard that is not covered by other warning signs (for example, air compressor hoses laid across the carriageway, welding cables, etc.).

Signs 1.34.1-1.34.2 "Direction of rotation" are installed in the POD in places where the direction of movement of vehicles changes. In this case, signs can be placed on shields or barriers.

Sign 2.6 "Advantage of oncoming traffic" is installed in the POD, as a rule, from the side of the traffic lane on which road works are carried out. In this case, sign 2.7 "Advantage over oncoming traffic" is set on the opposite side.

Signs 3.11 "Limitation of the total mass of the vehicle", 3.13 "Limitation of height", 3.14 "Limitation of width" are set in the PAD in the case when, according to the conditions of road works, the passage of vehicles must be limited in terms of mass or dimension.

Sign 3.20 "No overtaking" is installed in the POD on two- and three-lane roads when road works are carried out on the carriageway or shoulders. On multi-lane roads, overtaking is prohibited for the direction in which, due to the work carried out, traffic is carried out in fewer lanes.

Signs 3.21 "End of prohibition of overtaking", 3.25 "End of maximum speed limit" or sign 3.31 "End of all restrictions" are installed in the POD outside the road works area at a distance of no more than 100 m after the last guarding device in the direction of travel.

Sign 3.24 "Maximum speed limit" is set in the POD in the case when at the beginning of the section in the driving zone there is a change of lanes caused by a decrease in the number of lanes or road workers may enter the carriageway.

Signs 4.2.1-4.2.3 "Obstacle Avoidance" are installed in the POD in cases when it is necessary to indicate directions of detour of various fences or obstacles located on the carriageway on the section being repaired.

Sign 6.17 "Detour scheme" is installed in POD 150-300 m, before the start of the detour to indicate the route of movement in case of organizing traffic on the adjacent road network.

Signs 6.18.1-6.18.3 "Direction of the detour" are set in the POD before the start of the detour and at all intersections on the detour route.

Signs 6.19.1 and 6.19.2. "Advance changeover indicator to another carriageway" is installed in the POD on roads with a dividing strip when one carriageway is closed for traffic and when this section is bypassed along the carriageway intended for the opposite direction. In this case, in front of the place of changeover to another carriageway, sign 6.19.1 is installed, and in front of the place of return to its carriageway, sign

6.19.2. Table 8.1.1 "Distance to the object" is used in the POD with warning signs, if the distance from the sign to the beginning of the repaired section outside settlements is less than 150 m or more than 300 m, and in settlements less than 50 m or more than 100 m.

Table 8.1.3 and 8.1.4 "Distance to the object" are used in the POD with sign 1.25 at the points of turn towards the road section being repaired.

Plate 8.2.1 "Coverage area" is used in the POD with a repeated warning sign 1.25 "Road works" to indicate the length of the road works section being repaired.

Temporary road markings

Road markings in PAD are used on roads and streets with an improved type of coverage to organize traffic flows for the period of road works lasting more than three days.

Temporary road markings according to the POD are applied:
in the zones of driving away and stabilization to deviate the traffic flow to the full width of the traffic lane in the direction of changing the trajectory of movement, taking into account the driving distance;
in buffer zones and zones of work on the border of traffic lanes.
In places where the lines of temporary and permanent markings coincide, temporary markings are applied next to the permanent one.
When applying markings on the carriageway that deflect the traffic flow, its position on the carriageway corresponds to the installation line of fencing and guiding devices in the section of the traffic flow diversion.

Before answering specifically the question in the title of this article, let us shed some light on a few preparatory questions.

What does the abbreviation "PUD" mean? How does it stand for? What types of PAD are there?

The abbreviation "PAD" literally stands for "Traffic Management Project", but most often the above abbreviation means "Project for the Organization of Traffic and Pedestrian Traffic".

PODs are of several types:

1) PIT for the periods of construction and operation of new highways (streets, driveways, roads);

2) PIT for the periods of reconstruction and subsequent operation of existing highways (streets, driveways, roads).
The main goal is to ensure the safe passage of promising traffic flows with additional safety for pedestrians.

3) PIT for the period of construction, repair or geodetic work on existing carriageways of highways, streets, driveways and roads.
The main goal is to ensure the passage of existing traffic flows and the preservation of safe pedestrian paths for the period of work on the carriageways of the road network.

4) PIT for the period of placement of construction sites during the demolition, construction and reconstruction of objects for various purposes.
The main goal is to ensure the passage of existing traffic flows and the safety of pedestrian paths in the area affected by the construction site, located with the occupation of the carriageway or adjacent to it.

5) PUD for the period of operation of objects for various purposes.
The main goal is to ensure the passage of promising transport and pedestrian flows through the existing street and road network after the commissioning of completed construction projects.

6) PIT for periods of construction and operation of artificial irregularities (abbreviation IN, popular name - "speed bump").
The main goal is to place the MI in conjunction with the existing road traffic situation, as well as with the requirements of regulatory documents on artificial irregularities.

7) PID for the installation of advertising information signs (RIZ, the name in professional slang is "shields") or the so-called Passport of places for the installation of advertising information signs. The main goal is to place advertising information signs in conjunction with the existing traffic situation, and also with the requirements of regulatory documents for advertising and information signs.

Thus, in preliminary negotiations with persons intending to order a POD, it is necessary first of all to decide: which of the above types is the ordered PID. After the certainty is reached with the type of PTS to be developed, consideration of the original documentation available to the Customer begins. We list the main source documents required for development certain types POD:

1. For the development of PAD for the period of construction of new highways (streets, driveways, roads), a road construction organization project (PIC) is required at a scale of 1: 500 or 1: 1000 and a work production project (PPR, desirable).

2. For the development of PTS for the period of operation of new highways (streets, driveways, roads), general plan roads on a scale of 1: 500 or a master plan of a road in red lines on a scale of 1: 500.

3. For the development of a PAD for the period of reconstruction and further operation of existing highways (streets, driveways, roads), a construction organization project (PIC) of the reconstructed road at a scale of 1: 500 or 1: 1000, a work production project (PPR, preferably) and a master plan are required the reconstructed road on a scale of 1: 500 or the general plan of the reconstructed road in red lines on a scale of 1: 500.
If, for any reason, the Customer does not have enough initial documentation for the development of an AMP for the period of construction, reconstruction and operation of highways and roads, a slightly different approach will be applied on the part of the AMP developers at Signum-Plus LLC. In this case, the Customer may be asked for the main technical parameters of the work during the reconstruction of an existing or construction of a new road, and the PAD is performed in accordance with the requested parameters and the surveyed existing road and transport situation at the facility. This method of performing design work by the employees of Signum-Plus LLC is jokingly called “from the knee”.

4. For the development of PTS for the period of construction, repair or geodetic work on existing carriageways of highways, streets, driveways and roads, for example, a master plan of utilities on a scale of 1: 500 and a construction organization project (PIC) for laying utilities on a scale are required 1: 500. If the Customer does not have the above-mentioned POS, the POD is performed according to the general plan of engineering networks and according to some technological parameters of their laying, requested from the Customer, or even known from the experience of the employees of Signum-Plus LLC (that is, again "from the knee").

5. For AML for the period of placement of construction sites during the demolition, construction and reconstruction of objects for various purposes, a POS is required for these objects. Often, the POS developed for the Customer, for example, by the General Designer, to put it mildly, does not quite comply with the requirements and regulations in force in the field of traffic management in Russian Federation currently. In this case, during the development of the PAD, it is necessary to adjust the PIC (of course, after notifying the Customer about this).

6. For the development of PAD for the period of operation of objects of various purposes, a master plan of the object on a scale of 1: 500, floor plans of the object (for example, for multifunctional shopping centers), as well as basic technical and economic indicators (TEP) of the object are required. As mentioned above, if the general plan of an object does not comply with the requirements and standards in force in the field of traffic management in the Russian Federation at the present time, when developing the PAD, the master plan must also be adjusted.

7. For the development of PAD for the periods of construction and operation of artificial irregularities ("speed bumps"), a passport of the street (road, passage) on which the ID will be installed is required. In most cases, the Customer does not have the above documentation. Therefore, this type of PAD is developed in 90% of cases "from the knee".

8. To develop an AML for the installation of advertising information signs (Passports for the installation of advertising information signs), a passport of the street (road, passage) on which the RIZs will be installed is also required. But in 95% of cases, the Customer does not have this documentation. For this reason, the development of PIDs is done again from the knee!

After the Customer has ordered the POD and provided at least partially the initial documentation necessary for its development, the specialists of Signum-Plus LLC (in 100% of cases!) Go to the site of the facility to examine the existing traffic situation.

With the help of a voice recorder, digital camera, video camera and road curvimeter (in professional slang - "dragonflies"), the following parameters are recorded:
- the width of the carriageways located in the area of \u200b\u200btransport service of the facility (or in the area of \u200b\u200bthe future laying of engineering communications);
- width of separate lanes for traffic in each of the existing directions;
- the size of lawns, reinforced shoulders and sidewalks for pedestrians;
- parameters of a separate tramway track (if any);
- existing city lighting masts (MGO) or trolleybus contact network supports;
- the locations of the existing technical means of organizing road traffic (horizontal and vertical road markings, road signs, information boards, holding transport, bridge and pedestrian barriers, traffic lights).
Also, during a transport survey, measurements are made of the average traffic intensity of vehicles and pedestrians in all directions. In some cases, for example, when calculating the cycle of a projected traffic light object, measurements are taken of the traffic intensity of vehicles and pedestrians in the evening and morning rush hours.

Then, in the office of Signum-Plus LLC, on the basis of the initial permitting documentation provided by the Customer, the data of the transport survey and the regulatory documentation in force in the field of traffic management in the Russian Federation at the present time, the PAD itself is developed directly.

After the development of the AML, it is agreed with the traffic police in the prescribed manner, and then transferred to the Customer.

We offer you to organize traffic on the best conditions:
- We implement urgent projects!
- We work in Moscow, Moscow region and all over Russia!
- Impeccable reputation since 2013!
- Great experience!
- Inexpensive cost!

ODD design

What is a traffic management project and what it is eaten with ...
Let's start our acquaintance with this product with this question. project activities.

This project it is necessary to carry out practically in all adjacent territories where there is traffic of vehicles and pedestrians, as well as in on-site parking lots and on the entire street and road network of any settlement. The implementation of the traffic management project is necessary to ensure the safety of road users, both pedestrians and vehicle drivers.

Traffic organization design - this is a difficult and responsible job that requires utmost attention to the smallest details, an individual approach to each object, the availability of appropriate intellectual and technical resources. In addition, it is necessary to have up-to-date information on the dynamics of traffic flows, to be able to analyze and model possible traffic situations.

In a nutshell, then traffic management project (TRA) - this is a plan of the roadway area, adapted to the specifics of the movement of road users at the facility, with the application of all technical means of traffic management (TSODD).

    The technical means include:
  • generally accepted road signs;
  • custom design signs;
  • horizontal road markings;
  • vertical markings on road construction elements;
  • pedestrian and barrier fences;

Let's consider the design of the organization of traffic on the example of parking lots and parking lots.
Parking lot design - a time-consuming process, which includes the development of project documentation and planning the placement of equipment in a parking lot or parking lot. Car parks are designed by qualified specialists. Experienced staff
... make up schemes (cartograms) of the movement of vehicles and pedestrians
... consider the different arrangement of seats, taking into account the largest capacity and taking into account the regulatory documentation,
... planning the placement of equipment to control the movement of vehicles.

Also, documentation is being prepared for the management and organization of traffic during the construction of the parking lot and during its operation. The features of the transport situation (location of the nearest intersections and stops, road congestion) are analyzed. The specialists of "PrimeKAD Systems" plan the size of the places and the width of the lanes, develop an evacuation plan.

When placing barriers and traffic lights, attention is paid to additional features: throughput, turning radii of vehicles, etc. If the arrangement of technical equipment is performed correctly, this will provide a comfortable and safe use object by road users.

Also, employees of "PrimeCAD Systems" can provide advice on the operation of the facility and personnel requirements. Compliance with safety rules, the possibility of a convenient check-in and compliance with all regulatory legal acts are mandatory.

Why and who needs a road traffic management project (TRA):
A traffic management project or, as they sometimes say, a traffic management scheme is necessary in all cases where vehicles are moving, whether it is a store parking, a parking lot at hotel complex, roadside cafe, kindergarten, school, office center or inside the courtyard area of \u200b\u200ba residential area. In all these cases, it is necessary to organize the safe and correct movement of pedestrian transport and all possible road users, taking into account the specifics of the relief, the movement of sweats of transport and pedestrians, and taking into account the intensity and saturation of traffic. It also requires the organization of traffic in underground parking lots of large objects.

The development of a traffic management project is necessary for the owner of the territory, since the owner of the building and the surrounding area is responsible for what is happening within its framework and in the event of an accident in the territory where the traffic is not organized properly, the owner of the facility where the accident occurred is responsible. If the movement at the facility is organized correctly, then the culprit of the incident would be identified on a formal basis - whoever did not take into account the established road signs is to blame. Since the organization of traffic provides for traffic without conflicts, the occurrence of an accident subject to the rules of the road is impossible.

The AML also takes into account the interests of people with limited mobility, as the people say disabled people. The designation of parking spaces for disabled people by marking and installing an appropriate group of road signs is also considered a traffic management project. Now the topic of low-mobility groups of the population has become especially relevant, recently there have been a lot of standards that were not previously available. And in the light of the release of standards, frequent checks of parking lots and parking lots where the organization of traffic was performed without taking into account parking places for people with limited mobility began. Which, accordingly, are followed by not small fines ...

The presence of transport schemes - projects for organizing traffic from the owners of the territories is monitored by such departments as the traffic police, the prosecutor's office and the local administration.

You can find examples of traffic management projects below (link). Also, the design of the organization of road traffic is necessary when carrying out work on the restoration, reconstruction of various objects with the occupation of the carriageway or pedestrian part of the road network (UDS). For example, re-laying or construction of engineering networks, restoration of building facades. In this case, it is a temporary traffic organization for the period of work on the reconstruction and repair of an object. Regarding the project of organizing road traffic on Federal and city roads, there are also so-called road schemes or schemes for the dislocation of road signs and technical means of organizing road traffic. This project product is regulated by the Rules for Preparing Traffic Management Projects, approved by the order of the Ministry of Transport of Russia.

Who approves the traffic management project (TRA)

It is necessary to agree on the project of traffic management in Moscow:
- With the Department of Transport and Road Infrastructure Development
- State Unitary Enterprise Mosgortrans if there are public transport routes in the design area
- GKU TsODD

If the organization of traffic (the project for the installation of road signs) is designed in a closed area (on-site parking, in-yard areas). That project approval is not required. If we are talking about coordination outside Moscow and the region, the POD is coordinated by the asset owners, as a rule, this is the local administration or branches of Rosavtodor.

Also, the design of the organization of traffic is necessary when carrying out work on the restoration, reconstruction of various objects with the occupation of the carriageway or pedestrian part of the road network (UDS). For example, re-laying or construction of engineering networks, restoration of building facades. In this case, it is a temporary traffic organization for the period of work on the reconstruction and repair of an object.

Examples of completed projects:

1. This image reflects the project of traffic management for the period of operation (according to a permanent scheme) in Moscow, namely: traffic organization at the intersection of Prospekt Mira streets - st. Boris Galushkin - st. Kasatkina. This traffic organization was designed as part of the reconstruction of traffic light regulation on this object, the task is very difficult, but doable.

2. This image reflects the traffic management project for the period of construction of a traffic light facility, the temporary traffic organization project was developed as part of the project for the reconstruction of a traffic light facility at the address: Prospekt Mira - st. Boris Galushkin - st. Kasatkina.

3. This image reflects the project of traffic management for the period of operation (according to a permanent scheme) of a traffic light facility in the Kaluga Region on the Moscow-Medyn Federal Highway, Dobroe settlement. In this case, the task was to reduce accidents at this intersection by developing traffic management and traffic light control devices.

4. This image reflects the project of traffic management for the period of work on the restoration of the house where Taneyev lived, this traffic and pedestrian traffic scheme was developed only for the period of work on the reconstruction of the building, after the completion of the work, the movement of transport and pedestrians was restored according to the permanent scheme.

5. This image reflects the project of the organization of traffic for the period of operation of the car park of the center wholesale trade METRO Cash End Carry on the street. Ryabinovaya, the development of the traffic plan included changing the existing traffic, widening the carriageway and designing raised safety islands.

6. This image shows the transport scheme of traffic on the territory of the METRO Cash End Carry wholesale center on the street. Rowan

7. Organization of traffic at a traffic light facility in the Republic of Dagestan on a federal highway, a temporary traffic management scheme was also developed for the period of construction of a traffic light facility, the project was successfully implemented.

8. This project fulfilled the task of organizing traffic on the territory of the parking zone of the bus station at Moscow, Yeletskaya st. 26., the project was successfully implemented.

9. Project for the installation of road signs and road markings (arrangement of the parking area of \u200b\u200bthe store) for the period of operation on the territory of the shopping and entertainment complex "Vertical" in the city of Balashikha, Moscow region. The project was successfully implemented.

10. Transport scheme for the period of parking operation on the territory of the shopping and entertainment complex "Vertical" in the city of Balashikha.

11. Organization of traffic for the period of operation of a traffic light facility in the Moscow region, Ramensky district. A change in the organization of traffic is necessary in view of the commissioning of a residential microdistrict and, accordingly, an increase, or rather the emergence of pedestrian traffic flows in directions that did not exist before.

Traffic management project cost.
Each object is individual and the cost for each traffic situation is individual, it can vary from 45 tr. up to several hundred thousand. In order to find out the cost of your object, contact us

    We will develop and coordinate a traffic management project of any complexity:
  1. for the period of construction or reconstruction of the object
  2. for the period of operation of the facility
  3. for the period of work
  4. for the period of operation of parking lots and parking lots
  5. underground and surface parking
  6. transport hubs
  7. check pockets
  8. additional bands
  9. courtyard areas
  10. industrial zones
  11. road signs project of individual design
  12. at intersections and road junctions

If necessary, the development of project documentation can be completed within 1-2 days (negotiated individually)

We carry out work:

  1. Construction, reconstruction, modernization or commissioning of new infrastructure facilities (transport interchanges, roads, streets).
  2. For the temporary operation of industrial or construction projects, work with which requires a free entrance of large-capacity equipment.
  3. At the time of work on the restoration of individual sections of the roadway.

We also offer development temporary scheme of ODD, which is important for the rationalization and optimization of traffic and the creation of ramps, exits leading to construction sites, industrial and warehouse premises.