Projects of one-story houses from gas silicate blocks up to 100 sq m. What can we do for you

The geology of the site includes checking and examining the soil, this allows you to optimize the costs of the foundation.

What happens if you don't do geology?

If you ignore this stage, then you can choose the wrong foundation and lose from 1,000,000 rubles on alterations.

10-year guarantee for foundations, walls, ceilings and roofs.

Ask an engineer

What is included in the Engineering Solution?

Documentation on the location and equipment of all technical rooms, power points, water supply, ventilation, gas and sewerage.

What is included in the design solution?

A detailed plan and instructions for the foreman, which show all the necessary stages and technologies for the construction of the foundation, walls and roof.

What is included in the architectural solution?

Creation of a sketch and its 3D image, which displays the location and size of rooms, walls, roofs, furniture, windows and doors.

What will you get after this stage?

All technical and visual documentation. Designer supervision of the construction progress. Our architect and designer will visit the site on a weekly basis.

Still have questions? Ask an engineer.

Ask an engineer

What does the timing depend on?

The terms add up depending on the chosen project and material (houses made of logs and beams take time to shrink).

What is house shrinkage?

This is a natural process that the volume of wood walls and other details changes as the wood dries out.

Who will build my house?

We have our own staff of certified workers and foremen with specialized work experience of at least 5 years. The park has been put into operation since 2015 construction equipment... We do not involve contractors.

Still have questions? Ask an engineer.

Ask an engineer

I want it like this picture. You can?

Yes! You can send us any image and we will design and build what you want.

Do you have a designer on staff?

Now the staff employs 5 interior designers with a total specialized experience of 74 years.

What is included in the interior design project?

Drawing up a 3D project by a designer, as well as support and implementation of all finishing works.
We will also produce and supply furniture that suits your lifestyle and taste.

In the conditions of dense development of suburban cottage settlements, the project of a house made of foam concrete blocks up to 100 m2 meters is the optimal solution. Such houses are small, but compact; if desired, they can be one- or two-story. If you are not satisfied typical solutions, you can order the design and construction of a house according to the original project.

A country house made of foam blocks surpasses a brick one in terms of reliability, and is not inferior to a wooden one in terms of environmental comfort. It is a lightweight building material with a porous structure, does not require the construction of a heavy foundation, which saves the overall budget. A house made of foam blocks will be durable, strong and visually attractive, and due to the good air permeability of the material, there will always be a comfortable microclimate in the room. Another plus of the material is excellent thermal insulation and fire resistance.

At the design stage of a house made of foam blocks up to 100 sq m, we adapt each project to the region of development, taking into account climatic conditions and soil features.

They built a country house using frame technology plus a small veranda. It came out quite economically in terms of cost, but in terms of 3 and a half months. We even finished a couple of weeks earlier than promised. We go to the dacha only in the summer, so I can't say anything about thermal insulation. thanks

Thank you so much for the built aerated concrete house. The quality of both material and work is excellent - FRIENDS ENVY. The terms of the work performed are about 4.5 months a house was built from scratch. Good luck to all of you, good clients and big houses !!


They built a house for us in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration in the fall), it turned out not cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse with them! Thank you for such professional guys that you provided us!


Thank you so much for your work and attitude! Everything quickly, efficiently, quickly! Thanks to the team led by Alexey!


The company has built a great summer house for me! I have no complaints about the company, next summer I am going to build a bathhouse and a garage I will definitely turn to them. Thanks to everyone, especially to Sergey's brigade, who built it for me, a lot depends on them!


They built a house from aerated concrete in your company - very pleased. The house was built on our prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend.


In August 2017, he ordered a foundation (monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend because We were satisfied with the result. Everything was done quickly and professionally.


We ordered a house and a garage in this company in the summer of 2016. The builders worked for about 4 months, without a break (they liked it very much). Everything was done according to the contract, they did not ask for extra money.


Frequently asked questions before construction

About company

How long has your company been operating?

Our company started working as a repair and finishing company in 2007. From that moment on, we have grown to the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the campaign.

What confirms the competence of specialists?

All architects and engineers of the company have qualification certificates. Because the project does not have a company license, but an architect's certificate. By law, the responsibility for the project lies with the architect.

Does your company do all the work? Or do you hire contractors?

  • We ourselves carry out general construction, finishing work, site arrangement, wiring of engineering systems (electricity, heating at home, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler equipment, installation of wells, septic tanks.
  • Search, attraction, observance of agreements and control of work performance by contractors is our task.
  • We carry out 80% of all work on the construction of your house on our own and only 20% involve contractors.
  • We conclude a contract with each contractor, in which he indicates a guarantee for the work performed by him, and in the event of a malfunction, their elimination lies with the contractor.

Can I see the objects that are currently in work?

Yes, there are objects that we can show at different stages of work and houses that have already been commissioned by prior arrangement.

about the project

Buy a typical project or order an individual one?

Buy a finished project.

  • The plus is the price.
  • Minus - it will not provide for all your wishes regarding materials and layouts. Also, it will require revision for the features of your site.

Buy a finished project and modify it.

It all depends on the changes you want to make. It is possible that it will be more profitable for you to develop an individual project than to modify a standard one.

The cost of such improvements should be discussed at the meeting.

Development of an individual house project.

  • Pros: all your wishes are taken into account regarding all characteristics of the house and plot.
  • Minus - the cost of such a project is higher than that of a typical one.

BUT! You can develop an individual project for Free. If our company builds, the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with architects, at which the client voices his wishes. Based on the result of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several options for sketches and decide with the client in which direction to move on. Over the entire design period, several meetings with the client take place, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Project.
  • Further, the working draft is being developed. This is the stage of calculating each design solution, in which the client is not involved.
  • This whole process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed miscalculations, which is necessary when submitting documents for obtaining a building permit.

About construction

Will you visit the site where the construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighbors' buildings, the presence of a slope or difference, the cardinal points and what kind of soil on the site.

Do you help with choosing a plot for construction?

Yes. Our experts help with the selection of the site. They will help you find it according to your requirements on the Internet with ads.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • features of the architecture of the house
  • working conditions (work time restrictions)

What guarantees do you give?

We give a 3-year warranty for our work. The manufacturer gives a guarantee for materials and it is different in each case. There are materials for which the manufacturer gives an unlimited warranty.

How can I control construction?

  • We send each client a phased photo report of the work.
  • We install online video surveillance of the object 24 hours a day, access to it is available to you and the company's specialists (paid service).
  • You can also use the services of companies that carry out technical control.
  • Construction proceeds in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the development and approval of the estimate.

When do I have to pay for your work?

For design, an advance payment is made within 5 days after signing the contract in the amount of 70% of the total amount. The rest is paid when the finished project is handed over to the client.

Payment for construction is broken down according to the stages that are specified in the estimate. Each stage of construction is also broken down into payments, the amount of which may be different (usually this is due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if next to the construction site you have the opportunity where to place builders, a garden house, a construction trailer, an old house or any other building with a roof will do.
  2. If there is nothing of the kind, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will place our builders at a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a capacity of at least 5kW and industrial water.

If this is not the case, we will bring our generators FREE OF CHARGE. In most cases, water in wooden construction is used only for domestic needs, we will provide its delivery on our own.

What time of year do you build?

We build all year round, one of important conditions in the spring-autumn period it is a suitable road for vehicles.

WHAT CAN WE DO FOR YOU?

We will help you save money by correctly calculating the estimate and choosing high-quality materials.

To carry out high-quality design documentation, thanks to which you can not worry about the adopted design decisions.

We work throughout the Moscow region

Volokolamsky district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zaraisky district, Istrinsky district, Kashirsky district, Klinsky district, Kolomensky district, Krasnogorsk district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Luberetsky district, Mozhaisky district, Mytishchi district, Naro-Fominsky district, Noginsky district, Odintsovsky district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev-Posadsky district, Serebryano-Prudsky district, Serpukhovsky district, Solnechnogorsky district n, Stupinsky district, Taldomsky district, Chekhovsky district, Shatursky district, Shakhovsky district, Shchelkovsky district.

The minimum load-bearing wall thickness according to building codes is 250 mm, even if it is a summer house. The thinner walls are not able to withstand the loads of the roof and the influence of external factors such as wind. For year-round living in the house, it must be equipped with a heating system, facade insulation and ventilation. For internal partitions, smaller blocks are used, their thickness is 100mm.

Decorating aerated concrete house should be taken seriously. Aerated concrete is a material with increased vapor permeability. Due to the temperature difference (inside and outside), condensation forms in it. Therefore, for exterior decoration, it is worth choosing a material that reduces vapor permeability. The most affordable finishing option is painting. However, the walls in this case should be close to a perfectly flat state. You can reduce the cost of staining by using an inexpensive facade putty. To give it the desired color, add a water-based color. The most rational finishing option is a ventilated facade using sheet finishing materials (block house, siding, etc.). The most expensive is facing brick, it is also the most durable and reliable.

To reduce the cost of construction, you can abandon the full second floor and make an attic. To save a budget, it is better to choose a house shape close to a cube, with a minimum number of protrusions and complex shapes, to abandon bay windows and balconies. A large number of windows and a minimum of internal partitions also reduce the cost of building from aerated concrete

Researchers believe that an area of \u200b\u200b30 square meters per person is the most comfortable option. However, when designing a house, first of all, the construction budget is taken into account. The size of the plot also matters, its improvement is important, as well as the comfort inside the house. If the plot is not large, it makes sense to think about the second floor or attic.

To answer this question, first of all, it is necessary to conduct geological surveys. When high level groundwater construction of the basement floor will be unreasonably expensive. But if the soil allows, then building a basement will be appropriate when you want: make a workshop or storage room for inventory, make a pool or sauna. If the site is on a slope, such a basement is formed naturally. During construction, you can equip it and find useful use for it.

  • -it must be pitched;
  • - the edges should be as long as possible so that less moisture gets on the facade;
  • - it is better to abandon heavy materials (natural tiles) in order to reduce the load on the bearing walls;
  • - tightness must be observed so that moisture does not seep inside.

When choosing materials, it is better to turn to classic sheet metal. The most budgetary, but at the same time reliable and durable - slate (asbestos-cement sheet). However, such a sheet cannot be mounted on its own due to its weight and fragility, it periodically requires processing from the fungus. Bituminous slate (ondulin) is a very practical material. It is easy to install and affordable. Unlike metal tiles, it is noiseless.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the customer's family, a solution was proposed to move the terrace.
    foundation: based on geology and the architect's calculations, the house was erected on a pile-grillage foundation.
    floors: basement - solid concrete; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are custom made, with one-sided lamination, on-site installation.
    roof: metal tiles.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TZ-visualization, painted. The plinth is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as a basis. False beams were installed on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Design of his future home! Our team liked the project - such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in project colors. Additional accents are highlighted by the professional bar imitation dyeing and color matching.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an already existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was just such a difficult task. They had a foundation from an old burnt-out house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a project was made that took into account the old layout, but had a new modern shape with interesting innovations! The house now has an entrance group where you can sit at a table on cozy evenings and a complex but possible exploited roof in our lane. To implement such a roof, we called on our knowledge and modern construction Materials LVL beams, welded roofing and much more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth plastered walls with painted planken details, wood beams at the entrance added personality. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section of suburban architecture in the high-tech style, in a style chosen by courageous Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for life, which will perfectly fit into their difficult narrow area! With the advent of children, it was decided to make the dream come true, children grow up quickly and in their own home in nature there are many opportunities and fresh air. We, in turn, were happy to work on an individual project of a classic-style red brick house with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on the site, get acquainted with the construction team, make sure of the quality of work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement -zhb floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, laying on mortar ??? Windows inserted.
    roof: metal roofing
    terrace: rough enclosing elements are made, flooring is made.

    What was done

    Dmitry contacted our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations for sketch projects with minimum errors, no more than 2%. Having visited our construction sites and received the construction cost, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team has embarked on a challenging and expressive countryside project with spacious rooms and a garage, large windows and sophisticated architecture. After the delivery of the project, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + floors + roof. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced with 2 experienced bricklayers.
    The box on the pile-grillage foundation was delivered on time! The result pleased us and the customer. All stages of the work were agreed and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman, was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was erected on a reinforced pile-grillage foundation.
    floors: wooden on wooden beams, in places of large spans, installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; floor slab with noise insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, laying on mortar. Windows inserted.
    roof: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of a house with exterior decoration and then work on interior decoration! The frame technology has been chosen as energy-saving, pre-fabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work on our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different options for finishes, comparing their cost. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by a friend of the architect, but we had to work out its constructive part. After that, the most reliable and effective foundation was erected - the USP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are highlighted by the powerful overhangs, the interfloor belt and large windows!

    What was done

    When you decide to become the proud owner of your own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and, most importantly, WHO will do all this?
    Alexander, came to our company with a desire to move to his own vacation home... He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change and adapt the project to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with external finishing by the spring! Alexander watched every stage of construction, regularly visiting the construction site and was satisfied with the result, and we were with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! We built a house once good people and they recommended us to another good person! Rumyantsev Andrey came to our company with a desire to build a one-story spacious country house with a fireplace for warm family evenings instead of an old country house ... It was decided to build the house from aerated concrete blocks so that the future handsome country man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior finish is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and solid. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and patio were proposed, taking into account the cardinal points of the Customer's site.
    foundation: on the basis of geology and the architect's calculations, the house was erected on a pile foundation.
    floors: basement - solid concrete; interfloor - wooden on beams with 150 mm noise insulation.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are custom made with one-sided lamination, on-site assembly.
    roof: metal tiles.
    exterior finish: walls are insulated with basalt facade insulation and plastered. Based on the visualization, the facade panels under the Tolento stone have been added. The enclosing elements of the terrace, balcony are made of wood, made on site, based on the technical specification visualization, painted. Roof overhangs are lined with soffits in the color of the roof.

    Vladimir Murashkin,

    House owner "individual 8x9m"

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas for the future home, we light up twice! After all, to work on a new stylish project is always interesting and a kind of challenge, how to implement all bold ideas from a constructive point of view, what materials to use in this case? Vladimir bought a plot with picturesque views of the Oka River! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in a wooden house, but it was necessary to build a house in a short time and frame construction technology became an ideal solution for such tasks! If you really differ, then in everything! The house was made even more spectacular by a vertical finish imitating a timber made of durable larch, painted in natural shades with an emphasized wood texture. Complementing the modern look of the house - laminated windows! It turned out to be a great country house, with zest and at the same time incredibly functional.